Neighbor News
Falmouth: Vestas 110 Db Noise Turbine Letter Hidden From Public
Select Board unanimously voted in 2016 to appoint Gerald Potamis former Wastewater Superintendent as an associate to Falmouth ZBA.

Town of Falmouth agreed in 2012 to enter honest open negotiations in the CBI-WTOP negotiations with wind turbine victims to resolve a noise described as torture from the wind turbines. The costs of the negotiations was $139,000.00
The town withheld the 110-decibel warning from Vestas wind company. The manufacturer of the turbines. The town hid the letter until after a vote in 2013 not to take down the turbines. The town hid the letter from the voting public and the neighbors.
Wastewater Superintendent Gerald Potamis Falmouth ZBA hearing:
Find out what's happening in Falmouthfor free with the latest updates from Patch.
"Before the supply contract for Wind 2 was signed with the manufacturer, Vestas, the Town was asked by Vestas and its general contractor on the project (Lumus) to sign a letter taking full responsibility for the siting of Wind 2 in light of Vestas’ articulated concerns about the sound pressures this turbine is capable of creating in this location. This request came in the form of a letter from Lumus dated August 3, 2010 (the “Lumus Letter”)."
"The Town had its Wastewater Superintendent Gerald Potamis respond (the same day the Lumus letter was received), by sending a separate letter directly to Vestas. In that letter the Wastewater Superintendent assumed, for the Town, all such siting responsibility and liability (the “Potamis Letter”). An earlier draft of the Potamis letter, dated July 1, 2010 (so more than a month before the Potamis letter was sent to Vestas), called for the signature of the Falmouth Town Manager"
Find out what's happening in Falmouthfor free with the latest updates from Patch.
LETTER NEVER POSTED ON TOWN WEBSITE EVEN AFTER 7 YEARS
August 3, 2010
Mr. Gerald Potamis
WasteWater Superintendent
Town of Falmouth Public Works
59 Town Hall Square
Falmouth, MA 02540
RE: Falmouth WWTF Wind Energy Facility II "Wind II", Falmouth, MA
Contract No. #3297
Dear Mr. Potamis,
Due to the sound concerns regarding the first wind turbine installed at the wastewater treatment facility, the manufacturer of the turbines, Vestas, is keen for the Town of Falmouth to understand the possible noise and other risks associated with the installation of the second wind turbine.
The Town has previously been provided with the Octave Band Data / Sound performance for the V82 turbine. This shows that the turbine normally operates at 103.2dB but the manufacturer has also stated that it may produce up to 110dB under certain circumstances. These measurements are based on IEC standards for sound measurement which is calculated at a height of 10m above of the base of the turbine.
We understand that a sound study is being performed to determine what, if any, Impacts the second turbine will have to the nearest residences. Please be advised that should noise concerns arise with this turbine, the only option to mitigate normal operating sound from the V82 is to shut down the machine at certain wind speeds and directions. Naturally this would detrimentally affect power production.
The manufacturer also needs confirmation that the Town of Falmouth understands they are fully responsible for the site selection of the turbine and bear all responsibilities to address any mitigation needs of the neighbors.
Finally, the manufacturer has raised the possibility of ice throw concerns. Since Route 28 is relatively close to the turbine, precautions should be taken in weather that may cause icing.
To date on this project we have been unable to move forward with signing the contract with Vestas. The inability to release the turbine for shipment to the project site has caused significant [SIC] delays in our project schedule. In order to move forward the manufacturer requires your understanding and acknowledgement of these risks. We kindly request for this acknowledgement to be sent to us by August 4, 2010, as we have scheduled a coordination meeting with Vestas to discuss the project schedule and steps forward for completion of the project.
Please sign in the space provided below to indicate your understanding and acknowledgement of this letter. If you have any questions, please do not hesitate to call me.
Sincerely,
(Bruce Mabbott's signature)
___________________
Bruce Mabbott Gerald Potamis
Project Manager Town of Falmouth
CC: Sumul Shah, Lumus Construction, Inc.
(Town of Falmouth's Wind-1 and Wind-2 Construction contractor)
Stephen Wiehe, Weston & Sampson
(Town of Falmouth's contract engineers)
Brian Hopkins, Vestas
(Wind-1, Wind-2's turbine manufacturer, and also Webb/NOTUS turbine)
----------------------------------------------------------------------------
Select Board Chairwoman Susan Moran said last July 2017: “It's time to put the matter behind us and move forward.”
Susan Moran Select Board Chair

Click link to see presentation to Falmouth Zoning Board of Appeals
http://en.friends-against-wind.org/doc/senie-to-zba-ceasedesist-2015-09-17.pdf