News | Mar 2025
Navesink River Dredging, Which Started In December, Is Now Complete
Navesink River Dredging, Which Started In December, Is Now Complete
The Navesink is now at least 4 feet deep from the Swimming River Park boat ramp to the Rt. 35 bridge, and 5 feet into the Shrewsbury River.