Community Corner
Route 19, Connor/Gilkeson Improvements Continue This Weekend
Work is planned through 6 a.m. on Monday.

Work to improve Washington Road (Route 19/3069) and Connor/Gilkeson roads (Route 3038) in Mt. Lebanon will continue this weekend,Β Sept. 13-16,Β weather permitting,Β according to a news release from theΒ Pennsylvania Department of Transportation District 11-0.
Crews will be milling and paving Washington from Connor/Gilkeson to Mt. Lebanon Boulevard. Additionally, paving will occur on Connor/Gilkeson from East Terrace/Sunridge Drive to approximately Old Gilkeson Road.Β Work will occur fromΒ Friday, Sept. 13, at 6 p.m.Β toΒ Monday,Β Sept. 16, at 6 a.m.
To allow the work to occur, crossovers will be necessary fromΒ FridayΒ atΒ 7 p.m. to SaturdayΒ atΒ 8 a.m. and from SaturdayΒ atΒ 7 p.m. to SundayΒ atΒ 8 a.m.Β Additionally, single-lane traffic will occur as needed throughout the weekend.
Motorists are advised to use caution and be aware of changing traffic patterns when traveling through the work area.Β Expect delaysΒ and allow extra time.
PennDOT officialsΒ remind motorists to use all open lanes to merge points.
This work is part ofΒ a $5.56-million project thatΒ includes milling and resurfacing, guiderail, minor drainage, curbs, pavement markings, signing, traffic signals, median removal,Β ADAΒ ramps and other improvements on 2.55 miles of Washington Road from Connor/Gilkeson to Alfred Street. As part of this project, work and improvements will also occur on Gilkeson and Connor roads in the area of the Washington Road intersection. Overall work will conclude in early 2014.
The prime contractor isΒ Lindy Paving.
Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.