Regular Maintenance:
- Mowing at all parks is on a 7-10 day mowing schedule. This will reduce to 10-14 days when weather regularly is above 85 degrees.
- Weed control application on walkways and mulched areas will continue throughout the season.
Herbicide: MSDS
Pre-emergent: MSDS
- Mulching/weeding around park trees and planting areas will continue throughout the season.
- Summer aeration is planned at the following parks (early - mid July):
Windmill Hill Park - overseed select areas with Bermuda grass
Founder's Dog Park
Oronoco Bay Park
Waterfront Park
Projects:Windmill Hill:
- Several picnic table and bench pads are being installed, the picnic table pads will be flagstone to match the existing stone walkways (near completion). New tables are on order to replace the existing ones.
- Replacing the French drain at the low area of Founders Park with a faster drainage option. (scheduled for mid July)
- Water fountain is being installed near Northwest entrance of park. (Complete)
- Two benches are being placed on the Southwest area to mirror the two benches on the Northwest area (pads have been installed, benches should be arriving early July).
- Clearing of the English Ivy from the central flower bed (scheduled for mid July).
- Drainage is being planned to help reduce puddling on path (scheduled for early July).
- Low area on west side near playground regularly holds water, irrigation changes have been made to help with this and drainage options are being looked at to solve this issue.
- There was a leak in the irrigation line (in addition to the issues above) this issues has been resolved.
- Installation/repairs of timbers (Complete) and minor landscaping work (In Progress).