Community Corner
GDOT to Close Southbound GA 400 Lanes
Lane closures are needed overnight during construction on the GA 400 Buckhead pedestrian bridge.

If you plan to drive on GA 400 this week between 8 p.m. and 5 a.m., be prepared to slow down for lane closures underneath the MARTA Buckhead pedestrian bridge that's under construction.
The lane closures are needed to accommodate bridge deck patching and sign installation.
The southbound lanes will be closed from Monday, Jan. 27, toΒ Saturday, Feb. 1, by the Georgia Department of Transportation between mile markers 2 and 3.
Find out what's happening in Cummingfor free with the latest updates from Patch.
Southbound Lane Closures
(To remove overhand decking and patch bridge deck.)
Find out what's happening in Cummingfor free with the latest updates from Patch.
8 p.m. toΒ 5 a.m.
Monday, Jan. 27: Right lane ofΒ GAΒ 400
Tuesday, Jan. 28: Right lane ofΒ GA. 400
Wednesday, Jan. 29: Right lane ofΒ GAΒ 400
Thursday, Jan. 30: Two left lanes ofΒ GAΒ 400 to remove overhand decking, patchΒ bridge deck and set "MARTA" sign
Friday, Jan. 31: Two left lanes ofΒ GAΒ 400
Saturday, Feb. 1: Two left lanes ofΒ GAΒ 400
TheΒ GAΒ 400 pedestrian bridge project includes:
- A new entrance on the north end of the existing Buckhead Station
- Pedestrian bridge over north and southbound lanes ofΒ GAΒ 400
- An elevator/stair tower, sidewalk, and bridge connection on the east side of GA 400
- Sidewalk access to elevated walkway from Tower Place to connect to the bridge on the west side of GA 400
Thoughts? Tell us what you think in the comments,Β share your photos and videos, and donβt miss any of the local news you care aboutβsubscribe to Cumming Patchβs freeΒ newsletter,Β like us on FacebookΒ andΒ follow us on Twitter.Β
Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.