Community Corner

Plymouth Twp. Road Work Updates for Oct. 8-14

Updates on the I-476 Mainline Construction Project.

General Construction Impacts:
Walsh Construction and their sub-contractors will be working around the clock throughout the week at various locations and neighborhoods adjacent to the six-mile construction area will experience general construction noise. Noise will include heavy equipment, lights (at night), vehicle-mounted safety lights (at all times), and backup alarms (OSHA required). All efforts are being taken to limit the impacts to the adjacent communities; however, night work is going to occur as needed and the PTC will not limit the contractor’s hours of operation.

Plymouth Township Roadwork:
Road work will take place on the following roadways between 7 a.m. and 6:30 p.m., Monday through Friday: Walton Rd., Apollo Rd., Township Line Rd.

Structure work: Daytime: Hickory Rd. mainline bridge, Jolly Rd. mainline bridge, Township Line Rd. mainline bridge.

Find out what's happening in Plymouth-Whitemarshfor free with the latest updates from Patch.

Retaining walls:

  • 24-hour: Jocelyn Rd., Hickory Rd., Walton Rd., Fountain Rd., Allandale Rd., Colton Dr., Loretta Ln., Timberfare Cr., Beacon Hill Cir., Jolly Rd.

Find out what's happening in Plymouth-Whitemarshfor free with the latest updates from Patch.

Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.