Paving has been pushed back to Aug. 2 and 3, in the overnight hours of 6 p.m. to 6 a.m. on Lloyd Road between Church Street and Rt. 34.
This is overnight paving: Lloyd Road between Rt. 34 and Church St. will be closed from 6 p.m. to 6 a.m. both days.
An overturned vehicle on the Garden State Parkway in Aberdeen has prompted commuting delays in the area Wednesday morning, authorities said.
Paving is scheduled on Ardmore Lane Tuesday, June 28; on Autumn Lane Wednesday, June 29; and on Asbury Lane Thursday, June 30.
A disabled bus on the Garden State Parkway in Aberdeen prompted commuting delays in the area Wednesday morning, authorities said.
This is part of a much larger eventual project to entirely replace the bridge deck, which is in poor condition.
The parking lot and dock are the most affordable things to build first. South Amboy does not have the funding yet for the ferry terminal.
This is for Aberdeen residents only (residency will be checked) and you MUST have an appointment:
There are 11,000 JCP&L customers without power Tuesday morning, with the bulk of the outages in Lincroft and Howell.
As of 5:50 p.m. Tuesday, all three lanes of Rt. 9 southbound were closed in the area of Fairway Lane due to a serious car crash.
A 69-year-old Old Bridge man was hit by a car just before 5 p.m. Thursday, while attempting to cross Rt. 9, said police.
The Perth Amboy train station will be getting a $45 million makeover, getting new high-level platforms, new elevators, stairs and ramps.
Also, Old Bridge Township received $425,270 for the repaving and resurfacing of Throckmorton Lane.
Officials are asking motorists to avoid Atlantic Avenue due to planned road work.
New Jersey Natural Gas is replacing gas mains in Matawan and Aberdeen Township.
A stretch of Matawan Avenue will be closed for the repair and resurfacing of the bridge over the Garden State Parkway.
The state Dept. of Transportation gave Matawan borough $5.9 million to replace the bridge on Aberdeen Road that goes over Matawan Creek.
As of 11 a.m., all lanes of Rt. 79 at Wilson Avenue in Matawan remain closed due to a downed pole and power lines.
In Matawan, the borough received $150,000 to make road improvements to Sapphire Lane. In Aberdeen, $240,000 was given for Van Brackle Road.
Paving will result in a major overnight detour for traffic traveling on Lloyd Road towards Marlboro Township.
A major sewer main project is scheduled to start this Tuesday, Aug. 25 on Cliffwood Avenue. Details:
The long-talked about ferry service to New York City from South Amboy just got one major step closer to reality this week:
This tractor trailer got stuck in a dip on Perrine Road where it crosses Rt. 9, briefly shutting down Rt. 9 south through Old Bridge.
Aberdeen Twp. was also given $270,000 to continue the road upgrades being done to Cliffwood Avenue.
Rt. 9 through Old Bridge is currently reporting delays, as a dump truck overturned near Cindy Street. See video of the overturned truck:
A total of 22 road construction projects will take place in Aberdeen Twp. this year, from Cashel Drive to the Line Road border with Holmdel.
For riders of the North Jersey Coast line: NJ Transit will replace the Raritan River drawbridge between South Amboy and Perth Amboy.
Starting April 4 through April 11, County Rd. in Aberdeen Twp. will be closed for a railroad crossing repair and resurfacing project.
Breaking: Water main break just south of Addison Park at 8 a.m. Friday. Repairs could take up to eight hours today.
Breaking: Rt. 9 north between Texas Road and Spring Valley Road will be closed for approximately two hours., beginning at 1 p.m. Friday.
Breaking: After community outcry, Academy now announced they will extend Sayreville service to Midtown and Wall Street until June 30.
Breaking: Lloyd Road has been shut down in both directions from Church Street to Ivyhill Drive. It will remain closed for the next 8 hours.
South Amboy released this rendering last week of how the ferry terminal would look for the proposed South Amboy-to-Manhattan ferry route.
In tremendous news for area residents, the long-closed bridge will finally re-open at 8 a.m. Tuesday. The bridge has been entirely replaced.