The Wednesday evening incident caused delays up and down the Framingham-Worcester commuter rail line.
A wake will be held Thursday afternoon for Owen Bingham, an 18-year-old Dover-Sherborn student who died in a crash last weekend.
A one-mile stretch of Speen Street was closed Tuesday afternoon due to the incident.
Police say a 26-year-old from Framingham crashed his car off the side of the Mass Pike before running back into the road and getting hit.
The MetroWest Regional Transit Authority is reducing trips on three bus lines due to a driver shortage.
Town public works crews were on scene at two separate breaks on Wednesday with more than two dozen homes affected.
One of two scenic overlook sponsorships in Natick has been taken by a local tech company.
While lower than a month ago, gas prices in Natick remain high. Before you travel, know what to expect at the pump.
The cost of parking permits either downtown or for the MBTA Natick Center Station may remain with continuing low demand due to the pandemic.
The exits to Route 30 will be closed overnight on Monday and Tuesday this week, according to MassDOT.
The October celebration follows the official opening of the new Natick section in September.
Route 135 will cut off north-south crossings all day Monday in Natick, Framingham, Ashland and Hopkinton.
The new 2-1/2 mile section of the Cochituate Rail Trail will get an official christening on Tuesday.
A formal opening is still in the future, but walkers, bicyclists, joggers and more can enjoy a new piece of the trail now.
The Catch Connect service will allow residents to be picked up and dropped off within a certain area, similar to rideshare services.
The MassDOT grant will be put to use near Natick High School.
Part of Route 135 between Natick and Wellesley will close this weekend during an MBTA bridge replacement project.
The grand opening of a new Cochituate Rail Trail section is still in the future, but one new section has opened to the public.
The paving work will repair a bumpy stretch of Worcester Road, plus parts of Speen Street.
Starting Monday, crews will begin preparing to remove a stretch of South Main Street starting at Cottage Avenue.
The MBTA is replacing the Bacon Street bridge in Wellesley, which carries Framingham-Worcester line trains.
Know a place in Natick that could use a sidewalk or a bike lane? This is your chance to tell town officials.
The Complete Streets Prioritization Tool is now live for people who live and work in Natick to suggest areas for future projects.
A car and a semi collided in the westbound lanes early Wednesday morning.
Natick could get $23 million from the bill, including money to build parking at the town's two commuter rail stations.
Natick is seeking artists for a new painting scheme downtown aimed at making the major intersection more friendly.
The Passport Parking app will be an additional option on top of traditional ways of paying to park, according to Natick police.
During the Night of Full Closure, traffic will be reduced to a single lane on Route 30 starting at 8:00 PM in both directions.
The MBTA will hold a forum for MetroWest commuters on Tuesday to discuss planned service cuts.
The Boden Lane crossing in Natick was damaged one year go. MassDOT says no work on the span is planned right now.
Only minor injuries were reported, but the crash was causing long backups Tuesday afternoon.
A project to install a positive train control system along the commuter rail line has been finished, the MBTA says.
Buses replace trains starting on Friday morning, allowing MBTA crews to work on several key projects.
The MassDOT grant will go toward outdoor dining and pedestrian safety improvements.
MWRTA cut nighttime service in late March as a defense against coronavirus.
After the death of a man hit by an SUV in Natick on Christmas, Patch has compiled a map of where collisions have happened since 2017.
MWRTA routes that serve Natick, Marlborough, and Framingham will expand in coming weeks.
The long-awaited pedestrian route across Boden Lane opens for the Jan. 27 afternoon commute.
Natick commuters may have noticed the new pedestrian span. Here's what MassDOT says about when it will open.
The damaged Boden Lane Bridge has been removed. A temporary fix for pedestrians is under construction.