Lanes will be closed at an Upper Merion intersection during the daytime and nighttime next week, PennDOT said. See details here.
The latest water main break shut down an intersection in Upper Merion for around 16 hours.
Road work will impact traffic along the Route 422 corridor this summer.
The Turnpike Commission aims to widen and improve bridges around the 422 area.
Drivers should plan for delays in the early morning hours.
State police will be cracking down on areas where alcohol has been a factor in past crashes.
Additional traffic should be expected.
According to PennDOT, bridge construction work will force lane closures and periodic traffic paces in the early hours of Monday, May 13.
Lanes on U.S. 422 will close in both directions Tuesday and Wednesday morning in Upper Merion and Tredyffrin townships, PennDOT said.
The sinkhole crisis continues in King of Prussia.
The major shut down will allow for rehabilitation of the bridge, which is eligible for listing on the National Register of Historic Places.
The $7.8 million project will rehabilitate the old stone arch bridge, built in 1878, which carries nearly 25,000 vehicles a day.
Severe weather events and flooding in recent months and years has spurred a new round of road work in Montgomery County.
Winter weather has wreaked havoc on 422, Route 100, and other major roads around Montgomery County.
Authorities strongly urged Montgomery County residents to stay off the roads.
Motorists should plan for delays.
The bridge, built in 1878, carries 25,000 vehicles a day and is eligible for inclusion on the National Register of Historic Places.
The $7.8 million project will repair the 150-year-old structure, which handles nearly 25,000 vehicles per day.
But some of the closure remains in place, with no estimate for when it will be reopened.
Sinkhole issues persist in Montgomery County.
Minor flooding from the storm impacted roads as hundreds lost power in the major storm.
Motorists should plan for slow downs and delays.
Power is out for many local residents after a crash Monday morning.
The $13.6 million project has shut down the key roadway since March.
Delays are expected throughout the day, authorities said, as multiple detours are in place.
Motorists are likely to encounter delays in the area.
The tree work comes after powerful winds swept through the area, destroying many electrical lines and damaging trees.
The ongoing issue appears to be resolved as traffic patterns return to normal.
A major area highway has been reduced to a single lane as officials struggle to resolve an ongoing pothole crisis.
Downed trees and power lines had shut down the road this week.
Delays should be expected.
Work begins this week on roadwork that could slow down traffic significantly in the local area.
Huge increases in travel and traffic are expected this Memorial Day across Pennsylvania. What to know:
Construction work could back up traffic on one the area's key roadways this week. Details:
A tractor trailer crash and fuel spill on I-76 has prompted delays for commuters Monday morning, according to reports.
Delays are expected as the major project gets underway.
Motorists should plan ahead as slowdowns are expected.
"Unforeseen problems" with the water mains are causing the delay, officials said.
One of the area's most popular roadways is getting a makeover. Meanwhile, a new pedestrian bridge will help walkability. The latest:
The massive $3.6 million project is now underway.