Caltrans invites Napa County residents to attend a virtual meeting about improvements to the critical North Bay corridor.
Wires were down in the roadway and there was not an estimated time of reopening, Napa police said.
Here's how Napa County roads stacked up in an analysis of road conditions.
Here's when extra CHP officers will be out on highways and freeways, looking for intoxicated and dangerous drivers.
Highways in Napa, Sonoma and Solano counties were affected by flooded roadways and rock slides, with several closures in place.
Officers will be out in full force on Napa County's roadways and highways amid one of the year's heaviest traffic times.
Thanksgiving travel is expected to rebound to pre-pandemic levels. Planning ahead to get out of town will help you avoid any delays.
Significant storm-related damage left a section of the road near St. Helena closed for 10 days.
The city of St. Helena encouraged residents to reduce vehicle trips until the county completes repairs to storm-damaged Silverado Trail.
The temporary signals will improve traffic control on the detour route until repairs to the storm-damaged Silverado Trail are made.
"Efforts are underway to reopen this section of Silverado Trail as soon as possible."
During this time, the Airport Boulevard exit from state Highway 29 will be closed.
Logs spilled onto the roadway, blocking it in both directions west of state Highway 29, the CHP said.
The mudslide at the dam closed SR-128 between Markley Cove in Napa County and the Solano/Yolo county line.
A follow-up announcement will be made when the work is rescheduled.
Southbound Atlas Peak Road was expected to remain closed for several hours, the Napa County Sheriff's Office said.
One-way traffic control will be in place during the roadwork, which is expected to take 10 days.
A car hit a Caltrans sign and caught fire, California Highway Patrol reported.
One-way traffic control is expected to remain in place for the duration of the project, Caltrans said.
Napa County Public Works advised the roadway was closed from Lower Sanitarium to Upper Sanitarium.
Construction on the proposed project could begin as soon as spring 2023 and would take two years to complete.
The roadway was closed in both directions for several hours as crews transferred the fuel and cleared the wreckage.
The hazmat situation blocked all lanes of state Highway 221 at Anderson Road.
Around 6:30 a.m. Monday, CHP got word of a "3/4-ton delivery van loaded with bread 15-20 feet off the roadway."
Traffic was delayed on northbound and southbound state Highway 29, the Napa County Sheriff's Office said.
The closure eliminates the left-turn movement from northbound Red Top Road to westbound state Highway 12 toward Napa County.
Delays up to 30 minutes are possible all week, Napa County Public Works said.
Kate Miller makes a dedicated effort to ride her bike for transportation, even ditching the car for shopping trips.
Napa County Supervisor Alfredo Pedroza, chair of MTC, said the last year has taught the importance of contactless fare payment.
Sick of waiting at the stoplight? Find out which intersections tend to take the longest.
Salvador Avenue was closed for nearly five hours as Napa police investigated the fatal incident.
A Santa Rosa man died and a Calistoga man suffered major injuries and is suspected of DUI, the California Highway Patrol said.
One-way traffic control will be in effect for five consecutive days for maintenance within the "Elm Tunnel" north of St. Helena.
A recently released report ranks Bay Area roads and Napa County performed poorly. See which cities topped the list and which were the worst.
Three overnight closures are scheduled next week as construction continues on the Capell Creek Bridge Replacement Project in Napa County.
Motorists should expect up to 30-minute delays and use alternate routes, Napa County Public Works said.
Traffic may be lighter this Thanksgiving amid the pandemic but that's not an invitation, the CHP said, for drivers to exceed speed limits.
Caltrans will have one-way traffic control in effect part of next week.
Motorists will need to take city streets to avoid the closed intersection, Caltrans advised.
Construction of the Conn Creek Replacement Bridge is tentatively scheduled to be completed by December, according to Caltrans.